Summary – confirm before relying. This Kansas summary has not been fully verified against the statute. Values we could not confirm are left open; we confirm the rules on your first Kansas job. Unlimited Liens is not a law firm and does not give legal advice. Unlimited Liens is not a substitute for the advice of an attorney.
Kansas at a glance
Some claimants
Residential only: a sub/supplier may lien for improvement of an owner-occupied residence (or addition etc.) only if it mailed the statutory warning statement to an owner (or holds an owner-signed acknowledgement that the GC/claimant gave it); not required if claim is $250 or less. No fixed day count in the statute. A notice of intent to perform (K.S.A. 60-1103b) is required only where title passes before the lien is filed.
GC: 4 months after last furnishing. Subs/suppliers: 3 months after their last furnishing. Non-residential: either may extend to 5 months with a timely notice of extension.
Enforcement (lawsuit) deadlineForeclosure action within 1 year after filing the lien statement.
Lien sworn / notarizedYes
Residential projectsResidential (owner-occupied, max two families): subs/suppliers need the statutory warning statement mailed to an owner (K.S.A. 60-1103a). Notice-of-extension option not available for residential property.
Public projectsKansas public improvement bond (K.S.A. 60-1111) (K.S.A. 60-1111)
Notice: No pre-suit notice stated in 60-1111 for bond claims; when the bond is filed no lien attaches.
Suit: No action on the bond after six months from the completion of the public improvement or building.
Deadlines are calculated from the dates you enter and the statute summaries on this site. If a deadline falls on a weekend or legal holiday, the rules differ by state – we send and file before it.
Lien with Unlimited LiensSelf-service: you complete, confirm, sign and swear; we record.
Kansas rules on file
| Document / deadline | Who | When | Send to · how |
|---|---|---|---|
| Residential warning statement to owner Residential · K.S.A. 60-1103a(b) | Sub (hired by GC), Sub-sub (hired by a sub), Supplier (to GC), Supplier to a sub | Must have mailed the statutory warning statement to any one owner before claiming a lien; no deadline stated in the section When applicable | owner |
| File verified lien statement (original contractor) Private commercial, Residential · K.S.A. 60-1102(a) | GC (contract with owner) | Within four months after the date material, equipment or supplies were last furnished or labor last performed under the contract | court Sworn |
| File verified lien statement (sub/supplier) Private commercial, Residential · K.S.A. 60-1103(a)(1) | Sub (hired by GC), Sub-sub (hired by a sub), Supplier (to GC), Supplier to a sub | Within three months after the date supplies, material or equipment was last furnished or labor performed by the claimant | court, owner Sworn |
| Action to foreclose lien Private commercial, Residential · K.S.A. 60-1105(a) | GC (contract with owner), Sub (hired by GC), Sub-sub (hired by a sub), Supplier (to GC), Supplier to a sub | Within one year from the time of filing the lien statement (from maturity of a promissory note attached in lieu of an itemized statement) | court |
Notes
'notarized' here means verified statement required (case law: acknowledgment alone is not verification). Kansas state highway/other public contracts may have additional statutes (e.g. K.S.A. 68-410) - not checked.
Sources
- K.S.A. 60-1102: https://www.ksrevisor.gov/statutes/chapters/ch60/060_011_0002.html (checked 2026-11-15)
- K.S.A. 60-1103: https://www.ksrevisor.gov/statutes/chapters/ch60/060_011_0003.html (checked 2026-11-15)
- K.S.A. 60-1103a: https://www.ksrevisor.gov/statutes/chapters/ch60/060_011_0003a.html (checked 2026-11-15)
- K.S.A. 60-1105: https://www.ksrevisor.gov/statutes/chapters/ch60/060_011_0005.html (checked 2026-11-15)
- K.S.A. 60-1111: https://www.ksrevisor.gov/statutes/chapters/ch60/060_011_0011.html (checked 2026-11-15)
$1,000 / month
Unlimited jobs. 12-month agreement, signed online. Starts the day you sign; first invoice right away, then monthly. Postage and county fees passed through at cost.
- Unlimited jobs, any state
- Owner, legal description, lender and bond research from public records
- Preliminary notices and notices of intent, reviewed by our staff
- Lien waivers (statutory forms where they exist) and waiver requests
- Deadline tracking with traffic lights and reminders for every job
- Lien self-service: prefilled form, online notarization, e-recording, copies mailed